Appendix h: “Revisiones y pruebas a incluir en el programa de mantenimiento de una aeronave pilotada por control remoto (art. 50, 3.d.5 y 50.6)” (RPAS Maintenance Program).
Date: 2015
Summary: Regular revisions after the RPAS assembling are essential to guarantee the safety performance of the aerial vehicle; from the structure to the electrical connectors, fuel, battery and on-board equipment. A complete functional test, including ground and air segment, will be also necessary. In these scheduled revisions the personnel will check the operability of the Drone system, and the communications equipment will also be inspected before the first flight of the day is performed. Every six months a similar inspection program to the first one described must be made, and every 3 years a deeper and detailed revision must be executed.
Revisiones y pruebas a incluir en el programa de mantenimiento de una aeronave pilotada por control remoto (art. 50, 3.d.5 y 50.6)
- Alter Technology, first Notified Body in Europe accredited to certify drones - 9th February 2022
- Q&A – Declaration of Conformity and CE Marking - 4th November 2020
- NEW ISO STANDARD for Drones Released! - 29th January 2020